Nissan Stadium

Project Description

W&A Engineering was contracted to perform a topographic survey of the Nissan Stadium in preparation of the NHL’s 2022 Stadium Series.

Our W&A Engineering Nashville survey crew coordinated with stadium leadership and surveyed the topography of the entire playing surface. Working around several other crews on the field that day, our crew designed a custom project approach to ensure that they could work as efficiently as possible while not having their work disturbed or disturbing other stadium happenings throughout the day.

Over the course of nearly five hours, our team gathered 700 points, ensuring that the entire field was surveyed with the upmost precision.

The project was finished on time and on budget.

Location

Nashville, Tennessee

Services Provided

  • Topographic Survey

 

 

Browse All Projects